SOPREMA

Search

ELASTOPHENE® FLAM HR FR GR SKU: 01198

ELASTOPHENE® FLAM HR FR GR SKU: 01198

ELASTOPHENE Flam HR FR GR (high resistance, fire retardant, granules) is an SBS-modified bitumen cap ply for use in approved multi-ply membrane and flashing assemblies. ELASTOPHENE Flam HR FR GR is composed of a proprietary formulation of elastomeric styrene-butadiene-styrene (SBS) polymer modified bitumen and is reinforced with high performance glass scrim. The topside is surfaced with ceramic coated granules and underside is surfaced with polyolefin burn-off film to optimize heat welding.

Product Properties

  • ASTM ASTM D6163
  • Component Cap
  • Installation Method Heat-Welded
  • Reinforcement Glass Scrim
  • Thickness 138 mils (3.5 mm)
  • Topside Granules
  • Underside Burn Off Film

Installation

Prior to installation, unroll ELASTOPHENE Flam HR FR GR onto the roof surface and allow to relax. Position ELASTOPHENE Flam HR FR GR in desired position and back roll the product. ELASTOPHENE Flam HR FR GR is then heat welded to approved substrates. Refer to the SOPREMA SBS Roofing Manual for additional application guidelines.

 

Testing & Approvals

Related Products

COLPHENE® 180 PS

COLPHENE® 180 PS (polyolefin, sanded) is an SBS-modified bitumen base ply for use in approved multi-ply membrane waterproofing assemblies.

View Product

SOPRAFIX® BASE 612

SOPRAFIX® Base 612 is an SBS-modified bitumen base ply for use in approved multi-ply membrane and flashing assemblies and is…

View Product

SOPRAFIX® 3″ PLATES

SOPRAFIX® 3″ Plates are specifically manufactured for use in SOPRAFIX Systems. The unique design, including barbs and ribs, provide exeptional…

View Product

Related Projects

Flatiron Building – New York, New York

The Flatiron Building is a triangular 22-story, steel-framed building located at 175 Fifth Avenue in the borough of Manhattan, and is considered to be a ground-breaking skyscraper.

Northeast Louisiana State Office Building – Monroe, Louisiana

As an approved manufacturer for the State of Louisiana, the decision makers at the Facility Planning and Control Department were assured that the products installed offered unsurpassed quality. The final assembly was designed to meet FM Approvals 1-90 wind uplift test and proves to protect the building for many years to come.