SOPREMA

Search

SOPRALENE® FLAM 180 FR GR SKU: 03961

SOPRALENE® FLAM 180 FR GR SKU: 03961

SOPRALENE Flam 180 FR GR (fire retardant, granulated) is an SBS-modified bitumen cap ply for use in approved multi-ply membrane and flashing assemblies. SOPRALENE Flam 180 FR GR is composed of a proprietary formulation of elastomeric styrene-butadiene-styrene (SBS) polymer modified bitumen and is reinforced with a tough, dimensionally stable non-woven polyester mat. The topside is surfaced with ceramic coated granules and underside is surfaced with polyolefin burn-off film to optimize heat welding.

Product Properties

  • ASTM ASTM D6164
  • Component Cap
  • Installation Method Heat Welded
  • Reinforcement Polyester
  • Thickness (minimum) 150 mils (3.8 mm)
  • Thickness (nominal) 157 mils (4.0 mm)
  • Topside Granules
  • Underside Burn Off Film

Installation

Prior to installation, unroll SOPRALENE Flam 180 FR GR onto the roof surface and allow to relax. Position SOPRALENE Flam 180 FR GR in desired position and back roll the product. SOPRALENE Flam 180 FR GR is then heat welded to approved substrates. Refer to the SOPREMA® SBS Roofing Manual for additional application guidelines.

 

Testing & Approvals

Related Products

SOPRALAST® 50 TV ALU

SOPRALAST 50 TV ALU is a SBS-modified bitumen membrane used in roofing assemblies. SOPRALAST 50 TV ALU is reinforced with…

View Product

SOPRA-XPS 30

SOPRA-XPS 30 are rigid thermal insulation boards made of extruded polystyrene closed-cell foam. SOPRA-XPS 30 is mainly used as a…

View Product

ALSAN® RS PASTE

ALSAN RS PASTE is a rapid-setting, proprietary formulation polymethyl methacrylate (PMMA) heavy paste. ALSAN RS PASTE is used to fill…

View Product

Related Projects

Asian Health & Services Center – Portland, Oregon

American Airlines Center – Dallas, Texas

On March 21, 2022, a leaky roof on Dallas' American Airlines Center delayed the start of an NBA game between the hometown Mavericks and the Minnesota Timberwolves, and after the issue surfaced again a couple months later to interfere with a Mavs playoff game, quick action was needed to replace the building's 20-year-old roof.