SOPREMA

Search

ELASTOPHENE® PS 2.2 SKU: 00500

ELASTOPHENE® PS 2.2 SKU: 00500

ELASTOPHENE® PS 2.2 is an SBS-modified bitumen base ply for use in approved multi-ply membrane and flashing assemblies. ELASTOPHENE PS 2.2 is composed of a proprietary formulation of elastomeric styrene-butadiene-styrene (SBS) polymer modified bitumen and is reinforced with high quality random glass fiber mat. The topside is surfaced with polyolefin burn-off film and the underside is surfaced with fine mineral aggregate to facilitate cold adhesive and hot asphalt applications.

Product Properties

  • ASTM ASTM D6163
  • Component Base
  • Installation Method Cold Adhered, Asphalt Adhered
  • Reinforcement Glass Fiber
  • Thickness (minimum) 79 mils (2.0 mm)
  • Thickness (nominal) 87 mils (2.2 mm)
  • Topside Burn Off Film
  • Underside Sanded

Installation

Prior to installation, unroll ELASTOPHENE PS 2.2 onto the roof surface and allow to relax. Place ELASTOPHENE PS 2.2 in desired position and back roll the product. Apply approved cold adhesive or hot asphalt following manufacturer specifications. ELASTOPHENE PS 2.2 is then rolled into the cold adhesive or hot asphalt and subsequently rolled with a weighted roller. Subsequent approved inter-ply or cap ply membranes are applied to ELASTOPHENE PS 2.2 via heat welding. Refer to the SOPREMA SBS Roofing Manual for additional application guidelines.

 

Testing & Approvals

Related Products

SOPRA-ISO® PLUS

SOPRA-ISO PLUS is a rigid polyisocyanurate thermal insulation board used in approved multi-ply membrane assemblies. SOPRA-ISO PLUS comprises a closed-cell…

View Product

ELASTOPHENE® FLAM FR GR

ELASTOPHENE® Flam FR GR (fire retardant, granulated) is an SBS-modified bitumen cap ply for use in approved multi-ply membrane and…

View Product

COLPHENE® H-EV

COLPHENE® H-EV (environmentally friendly) is a hot-applied, rubberized asphalt waterproofing membrane for use in approved waterproofing assemblies.

View Product

Related Projects

American Airlines Center – Dallas, Texas

On March 21, 2022, a leaky roof on Dallas' American Airlines Center delayed the start of an NBA game between the hometown Mavericks and the Minnesota Timberwolves, and after the issue surfaced again a couple months later to interfere with a Mavs playoff game, quick action was needed to replace the building's 20-year-old roof.

Walter Reed Community Center – Arlington, Virginia

From the beginning, the architect designing the Walter Reed Community Center was asked to include a vegetative roof within the blueprints. The goal was a LEED certified Silver level building.