SOPREMA

Search

SENTINEL® COPPER ART PREFABRICATED INSIDE CORNERS SKU: M503

SENTINEL® COPPER ART PREFABRICATED INSIDE CORNERS SKU: M503

SENTINEL® Inside and Outside Corners are manufactured from fiberglass reinforced 60 mil PVC membrane and intended to flash 90 degree outside and inside corners. Prefabricated corners are available in white, copper and silver color options.

Product Properties

  • Type Membrane Accessories

Installation

SENTINEL Inside and Outside Corners are installed to the membrane using a hot air welder. Refer to SOPREMA® specifications and installation instructions for additional application guidelines.

 

Related Products

ELASTOPHENE® LS FR GR

ELASTOPHENE LS FR GR (low slope, fire retardant, granulated) is an SBS-modified bitumen cap ply for use in approved multi-ply…

View Product

COLPHENE® FLAM 180 FR GR

COLPHENE® Flam 180 FR GR (fire retardant, granulated) a proprietary formulation of elastomeric styrene-butadiene-styrene (SBS) polymer-modified bitumen, reinforced a nonwoven polyester mat. The topside is surfaced with ceramic coated granules, and the underside is surfaced with polyolefin burn-off film.

View Product

SOPRANATURE® SEDUM TILES

SOPRANATURE SEDUM TILES have a coconut fiber base to assure effective rooting of plants to the underlying growth medium and…

View Product

Related Projects

Fashion Institute of Technology – New York City, New York

The Fashion Institute of Technology needed a new roof on Building E in the dead of winter. In addition they wanted a low odor, green solution. The answer, SOPREMA’s advanced ALSAN RS 260 LO PMA liquid membrane system.

Parkland Hospital – Dallas, Texas

The new hospital featured flat rooftops at multiple levels that all needed to be made watertight for decades to come. The roofing system needed to be designed in a way that accounted for a helipad, consistent rooftop traffic, extensive rooftop equipment, lightwells and various utility platforms. A lot stood in the way of Anchor Roofing, the installer, but the meticulous planning for the project meant that all contingencies had been considered by the time application of the waterproofing system began.