SOPREMA

Search

SOPRAFIX® MBB BATTEN BAR SKU: F357

SOPRAFIX® MBB BATTEN BAR SKU: F357

SOPRAFIX® MBB (Metal Batten Bar) is a flat, nominal 1 inch wide AZ55 Galvalume metal bar with 3″ o.c. pre-punched round holes. MBB is available in 10’ feet or special order lengths.When installing MBB, center the MBB down the middle of the mechanically fastened side lap seam of the SOPRAFIX® field membrane ply. The SOPREMA® #15 or #14 fasteners are installed in the MBB pre-punched holes according to the applicable fastening pattern.

Product Properties

  • Type Stress Plate

Installation

When installing MBB, center the MBB down the middle of the mechanically fastened side lap seam of the SOPRAFIX field membrane ply. The #15 or #14 fasteners are installed in the MBB pre-punched holes according to the applicable fastening pattern.

 

Testing & Approvals

Related Products

ALSAN® COATING UNIVERSAL PRIMER

ALSAN Coating Universal Primer is a highly engineered, single component, water-based primer designed for application over aged single plies (TPO,…

View Product

ALSAN TRAFIK PU 411

ALSAN Trafik PU 411 is a single-component, aliphatic urethane elastomeric topcoat. This topcoat provides excellent adhesion to SOPREMA polyurethane system…

View Product

ALSAN TRAFIK RS 730 Flash

ALSAN Trafik RS 730 Flash is a high performance, rapid-setting, polymethyl methacrylate (PMMA) liquid resin for use in flashing applications….

View Product

Related Projects

Flores De La Playa Condominium – Satellite Beach, Florida

When selecting a product to re-roof the building after the storm, it was important to select a product that would be able to withstand the impact of future tropical storms and hurricanes. The system that was selected included a base ply of ELASTOPHENE® SP 3.0 with 350 PSI lightweight concrete applied on top and SOPRALENE® 180 PS 3.0 with a cap sheet of SOPRALENE Flam 180 FR GR.

Northeast Louisiana State Office Building – Monroe, Louisiana

As an approved manufacturer for the State of Louisiana, the decision makers at the Facility Planning and Control Department were assured that the products installed offered unsurpassed quality. The final assembly was designed to meet FM Approvals 1-90 wind uplift test and proves to protect the building for many years to come.