SOPREMA

Search

2-1 SOPRASMART ROCK

2-1 SOPRASMART ROCK

2-1 SOPRASMART ROCK is a high performance panel composed of an SBS-modified bitumen base membrane and SOPRAROCK high density mineral wool board. The 2-1 SOPRASMART ROCK is designed for use in approved multi-ply roof membrane assemblies.

Installation

Prior to installation, unfold 2-1 SOPRASMART ROCK onto the roof surface and allow to relax. 2-1 SOPRASMART ROCK is installed via mechanical fastening or hot asphalt following manufacturer specifications. When installing via mechanical fastening, 2-1 SOPRASMART ROCK is fastened through the patented DUO SELVEDGE lap following the details for the uplift pressure required.

Refer to the SOPREMA Low-Slope Roofing Insulation Technical Manual for complete application guidelines.

 

Related Products

2-1 SOPRASMART BOARD

2-1 SOPRASMART BOARD is a high-performance factory laminated panel combining an SBS-modified bitumen base membrane and SOPRABOARD an asphaltic roof…

View Product

3-1 SOPRASMART ROCK

3-1 SOPRASMART ROCK is a high performance panel of an SBS-modified bitumen base membrane, SOPRAROCK mineral wool board, and polyisocyanurate…

View Product

SOPRALAP FLAM

SOPRALAP Flam is an SBS-modified bitumen cover strip for use with SOPRASMART Laminated Board products. SOPRALAP Flam is reinforced with…

View Product

Related Projects

Woodridge Middle School – Peninsula, Ohio

With a tight schedule to meet, Woodridge Middle School was relying on SOPREMA’s SENTINEL products to do the job. The previous shingle and PVC roof was replaced with SOPRA-ISO, and tan SENTINEL P150 HFB. The gutters were then lined with ALSAN RS 222 primer and ALSAN RS 230 Flash.

Fourth Avenue Junior High School – Yuma, Arizona

The building that the Fourth Avenue Junior High resides in was built in 1920 and was named a National Historic Landmark in 1982. When the building required a re-cover roof project, its National Historic Landmark status and student safety was top priority. Due to its history and age, care needed to be taken when completing the project. The products installed were required to be odor-less and could not damage the building. A second requirement for the project was that it be completed quickly and without lingering odors, because they planned to complete the installation over their holiday break. This is where SOPREMA products came into play.