Search

ELASTOCOL™ STICK SKU: 38745

ELASTOCOL™ STICK SKU: 38745

ELASTOCOL STICK is an SBS polymer based primer approved for use in roofing, walls and waterproofing assemblies. ELASTOCOL STICK is comprised of a proprietary blend of SBS polymers, solvents and additives engineered to increase adhesion of self-adhered SBS membranes on approved substrates.

Product Properties

  • Base Solvent-Based
  • Overlying Application Self-Adhered
  • Type Primer

Installation

Thoroughly mix ELASTOCOL STICK prior to application. ELASTOCOL STICK is applied to the approved area via brush, roller or spray equipment.

Approximate coverage rates (non-porous substrates):
• Roofing: 70 to 100 square feet per gallon (0.7 to 1 gallons per 100 square feet)
• Walls and foundations: 350 square feet per gallon

Surface profile and porosity of the substrate will affect the coverage rates.

Ensure primer is tacky to-the-touch, but not wet before installing overlying membrane. Primer should not transfer to the fingertips when touched.

 

Testing & Approvals

Related Products

SOPRADRAIN™ 102/102PF

SOPRADRAIN 102 is a versatile workhorse that delivers first-rate protection for waterproofing systems. Faced with a non-woven fabric layer, this…

View Product

SOPRA-TITE Coping

SOPRA-TITE Coping offers a full snap-on design in 12 foot lengths with pre-punched fastening holes to ensure proper attachment to…

View Product

SOPRALENE® 180 PS 3.0

SOPRALENE 180 PS 3.0 is an SBS-modified bitumen base ply for use in approved multi-ply membrane and flashing assemblies. SOPRALENE…

View Product

Related Projects

U.S. Treasury Building – Washington DC

The Treasury Building is the oldest departmental building in Washington and has had a great impact on the design of other governmental buildings. At the time of its completion, it was one of the largest office buildings in the world.

Northeast Louisiana State Office Building – Monroe, Louisiana

As an approved manufacturer for the State of Louisiana, the decision makers at the Facility Planning and Control Department were assured that the products installed offered unsurpassed quality. The final assembly was designed to meet FM Approvals 1-90 wind uplift test and proves to protect the building for many years to come.