SOPREMA

Search

ALSAN® RS PASTE SKU: L-RS224

ALSAN® RS PASTE SKU: L-RS224

ALSAN RS PASTE is a rapid-setting, proprietary formulation polymethyl methacrylate (PMMA) heavy paste. ALSAN RS PASTE is used to fill small cracks, depressions and voids in non-traffic bearing horizontal or vertical substrates after priming and prior to application of ALSAN RS and ALSAN TRAFIK RS systems. ALSAN RS PASTE can also be used to smooth out laps on ALSAN RS 230 and ALSAN RS 260 membranes when applying aesthetic top coats or surfacing on roofing and non-traffic bearing waterproofing applications.

Product Properties

  • Installation Method 2 Part
  • Material Paste

Installation

Using a slow-speed (200-400 rpm) mechanical agitator, thoroughly mix the entire container of resin for two minutes before use. Only catalyze the amount of material that can be used within 10-15 minutes. Add the pre-measured catalyst to the resin, stir for two minutes and apply to substrate. The amount of catalyst required is determined by resin weight and ambient temperature

 

Related Products

SOPREMA Industrial XL Gutter

SOPREMA Industrial XL Gutter is the largest gutter system that is engineered and tested to meet the requirements of the…

View Product

2-1 SOPRASMART ROCK

2-1 SOPRASMART ROCK is a high performance panel composed of an SBS-modified bitumen base membrane and SOPRAROCK high density mineral…

View Product

SOPRALENE® FLAM 250 FR+ GR

SOPRALENE® Flam 250 FR+ GR (fire retardant, granulated) is an SBS-modified bitumen cap ply for use in approved multi-ply membrane…

View Product

Related Projects

Garibaldi Square Condos – Chicago, Illinois

This award winning project is the direct result of the building owner’s resistance to using hot asphalt and torches on the roof. SOPREMA’s mechanically attached, self-adhered system was used to accommodate the building owner’s desires.

San Francisco Airport – San Francisco, California

San Francisco International Airport is the 13th largest airport in the United States featuring four modern runways. The new International Terminal opened in 2000 and had the distinction of being the largest terminal building ever built in North America. SOPREMA was able to provided a cost-competitive, UL Class A system with a 20-year labor and material warranty.