ALSAN® COATING AC 401 FLASHING SKU: L-AACFGA
ALSAN® COATING AC 401 FLASHING SKU: L-AACFGA
ALSAN COATING AC 401 FLASHING is a high quality, fiber-fortified, water-based, acrylic elastomeric roof mastic. Upon cure, ALSAN COATING AC 401 FLASHING forms a durable weatherproof seal, prepping the surface for application of ALSAN COATING AC 401.
Product Properties
- Material Flashing
Installation
All surfaces must be dry and free of dirt, debris, algae, mildew, oil, talc, loose granules or any other foreign matter that may prohibit adhesion. ALSAN COATING AC 401 FLASHING may be applied in combination with POLYFLEECE reinforcement by trowel, brush or putty knife for most flashing applications.
Please refer to the SOPREMA Roof Coatings Technical Manual for additional application guidelines.
Related Products
ALSAN® COATING AC 401
ALSAN COATING AC 401 is a high quality, single component, water-based, acrylic elastomeric roof coating and protective barrier for…
View ProductALSAN® COATING ASPHALT BLEED BLOCKING PRIMER
ALSAN COATING ASPHALT BLEED BLOCKING PRIMER is a water-based, acrylic primer that is VOC compliant, single component and used to…
View ProductALSAN® COATING BUTYL FLEECE TAPE
ALSAN COATING BUTYL FLEECE TAPE contains a butyl rubber compound with a polyester fleece face used where required or recommended…
View ProductRelated Projects
Fishers Island Club – Fishers Island, New York
When it was time to build a new building at the club, SOPREMA products were called into action. On this new building, our COLPHENE® 3000 product was chosen to waterproof the foundation because of its superior strength and adhesion.
Parkland Hospital – Dallas, Texas
The new hospital featured flat rooftops at multiple levels that all needed to be made watertight for decades to come. The roofing system needed to be designed in a way that accounted for a helipad, consistent rooftop traffic, extensive rooftop equipment, lightwells and various utility platforms. A lot stood in the way of Anchor Roofing, the installer, but the meticulous planning for the project meant that all contingencies had been considered by the time application of the waterproofing system began.