SOPREMA

Search

COLPLY® EF FLASHING CEMENT SKU: A217

COLPLY® EF FLASHING CEMENT SKU: A217

COLPLY EF FLASHING CEMENT is a moisture cure singlecomponent elastomeric liquid-applied flashing adhesive using a highly advanced Silyl-Terminated Polyether (STPE) polymer. COLPLY EF FLASHING CEMENT’S thick-bodied, trowel-grade consistency makes it ideal for flashing details.

Product Properties

  • Overlying Material SBS Membrane

Installation

COLPLY EF FLASHING CEMENT is applied to approved, compatible substrates using a notched trowel. Apply COLPLY EF FLASHING CEMENT at 2 to 2.5 gallons per 100 square feet for sand surfaced interply applications. The application rate over approved absorptive or rough substrate surfaces vary, requiring 2.5 gallons or more per 100 square feet. Specifically granulated surfaces require 4 to 5 gallons per 100 square feet. COLPLY EF FLASHING CEMENT is applied to both the flashing ply and the substrate prior to placement of the flashing ply.

 

Related Products

SENTINEL® BOOT FLASHINGS

SENTINEL BOOT FLASHINGS are factory fabricated, cone-shaped boots made using reinforced SENTINEL P150 PVC membrane. Available for traditional or split-pipe…

View Product

SOPREMA Industrial XL Gutter

SOPREMA Industrial XL Gutter is the largest gutter system that is engineered and tested to meet the requirements of the…

View Product

SOPRAROCK Cant Strips

SOPRAROCK CANT STRIPS are a rigid mineral wool cant, coated with a bitumen and lightly sanded surface. SOPRAROCK CANT STRIPS…

View Product

Related Projects

Deer Meadow Primary School – Greencastle, Indiana

Deer Meadow Primary School is a public elementary school located in Greencastle, IN. Designed with highly visible roofing architectural appearance on all sides of the building, a roofing membrane with color matching aesthetics and long-term performance was needed. SOPREMA®’s SENTINEL® Copper Art P150 HFB PVC was a perfect fit.

Northeast Louisiana State Office Building – Monroe, Louisiana

As an approved manufacturer for the State of Louisiana, the decision makers at the Facility Planning and Control Department were assured that the products installed offered unsurpassed quality. The final assembly was designed to meet FM Approvals 1-90 wind uplift test and proves to protect the building for many years to come.