INSONO AF3-47 SKU: SP0003
INSONO AF3-47 SKU: SP0003
INSONO AF3-47 is composed of self-adhesive elastomeric bitumen with an exposed non-woven polyester reinforcement. The underside is surfaced with a protective release film. INSONO AF3-47 is designed for use under ceramic tiles but can also be installed with wood flooring or vinyl planks. INSONO AF3-47 offers sound damping, crack insolation through a concrete slab and waterproofing.
Product Properties
- Surface Non-woven polyester
- Thickness 47 mils
- Underface Silicone release film
Installation
Prepare surface with INSONO AF3 Primer, ELASTOCOL® Stick H2O or RESISTO H2O Primer, follow drying times indicated on the primer data sheet then install the INSONO AF3-47 membrane. Apply the polymer-modified mortar and install the ceramic tiles. For installations where waterproofing is required, waterproofing strips, such as SOPRASEAL® Stick 1100 must be installed prior to INSONO AF3-47.
Related Products
SOPREMA® Counter Flashing
SOPREMA® Counter Flashing is designed to provide a watertight termination at the leading edge of the roofing material. SOPREMA Counter…
View ProductELASTOPHENE® STICK
ELASTOPHENE Stick is an SBS-modified bitumen, self-adhered base ply for use in approved multi-ply membrane and flashing assemblies. ELASTOPHENE Stick…
View ProductELASTOPHENE® FLAM 2.2
ELASTOPHENE® Flam 2.2 is an SBS-modified bitumen base ply for use in approved multi-ply membrane and flashing assemblies. ELASTOPHENE Flam…
View ProductRelated Projects
Fayetteville Area System of Transit Multimodal Project – Fayetteville, North Carolina
The original design selected for the center left the project over budget, so the contractor and architect had to go back to the drawing board. After researching additional options, both Baker Roofing and Gantt Huberman Architects felt very comfortable with SOPREMA’s proven history and the ability to meet the Buy American requirement, so they selected the SENTINEL® line for the project.
Carrick High School – Pittsburgh, Pennsylvania
In 2017, Carrick High School’s roof was ready to be replaced. It was decided the best option was to tear off the previous roof and start fresh. Due to the relationship the architect, HHSDR Architects / Engineers, has with SOPREMA, the system that was selected to replace the previous roof included: SOPRA-ISO®, SOPRABOARD®, SOPRALENE® Flam Stick and SOPRALENE FLAM 180 FR GR.