Search

COLPHENE® FLAM 180 FR GR SKU: 01226

COLPHENE® FLAM 180 FR GR SKU: 01226

COLPHENE® Flam 180 FR GR (fire retardant, granulated) is an SBS-modified bitumen cap ply for use in approved multi-ply waterproofing assemblies. COLPHENE Flam 180 FR GR is composed of a proprietary formulation of elastomeric styrene-butadiene-styrene (SBS) polymer modified bitumen and is reinforced with tough, dimensionally stable non-woven polyester mat. The topside is surfaced with ceramic coated granules and underside is surfaced with polyolefin burn-off film to optimize heat welding.

Product Properties

  • Installation Method Heat Welded
  • Reinforcement Polyester
  • Thickness 160 mils (4.0 mm)
  • Topside Granules
  • Underside Burn Off Film

Installation

Prior to installation, unroll COLPHENE Flam 180 FR GR onto the surface and allow to relax. Position COLPHENE Flam 180 FR GR in desired position and back roll the product. COLPHENE Flam 180 FR GR is then heat welded to approved substrates. Refer to SOPREMA® specifications and installation instructions for additional application guidelines.

 

Testing & Approvals

Related Products

SOPRAMASTIC™ SBS ELASTIC CEMENT

SOPRAMASTIC SBS Elastic Cement is a modified bitumen mastic for use in approved multi-ply membrane, flashing and waterproofing assemblies. SOPRAMASTIC…

View Product

ELASTOPHENE® FLAM 2.2

ELASTOPHENE® Flam 2.2 is an SBS-modified bitumen base ply for use in approved multi-ply membrane and flashing assemblies. ELASTOPHENE Flam…

View Product

ALSAN TRAFIK EP 141

ALSAN TRAFIK EP 141 is a two-component, high solids, low odor, liquid applied epoxy primer. This primer provides excellent adhesion…

View Product

Related Projects

DFW International Airport – Dallas, Texas

The Dallas Fort Worth International Airport (DFW) became one of the first major U.S. airports to go carbon neutral in 2016, and since then, the facility has only accelerated its sustainability efforts. When ELASTOPHENE® and SOPRALENE® with ECO3 granules were specified for the roofs of DFW’s Terminal F Skylink buildings, it represented a new level of commitment to our planet.

Lancaster Material Distribution Center – Lancaster, Texas

In May 2017, the Lancaster Material Distribution Center needed a new roof. While the original SOPREMA asphalt system was in decent shape, it was nearly 25 years old and at the end of its life. Through value engineering, it was decided that the existing system would be left in place to save cost. SOPREMA products were selected to re-roof this project due to the proven durability of the existing roof. The system that was installed included ELASTOCOL® 500, COLVENT® Flam, ELASTOPHENE® Flam LS FR GR, SOPRALENE® Flam 180 and SOPRALENE Flam 180 FR GR.