SOPRASEAL® LM 202 VP SKU: A501
SOPRASEAL® LM 202 VP SKU: A501
SOPRASEAL LM 202 VP is a one-component spray applied vapor-permeable air barrier membrane used in wall construction. SOPRASEAL LM 202 VP is a water-based, ultra low VOC liquid product composed of a modified rubber formulation. This non-flammable vapor permeable air barrier provides moisture protection behind wall claddings such as brick, siding, metal panels, EIFS, and stucco. Utilization of a slipsheet is required for stucco cladding.
Product Properties
- Air Permeability ASTM ASTM E2178
- Air Permeability ASTM ASTM E2357
- Air Permeability ASTM ASTM E283
- Vapor Permability ASTM ASTM E96 (Procedure B)
Installation
To apply SOPRASEAL LM 202 VP mix the product until thoroughly blended. Use a ¾” (19 mm) nap roller, paint brush or spray equipment to apply. Please refer to SOPREMA specifications and installation instructions for additional application guidelines prior to use.
Testing & Approvals
Related Products
SENTINEL® P150 HFB
SENTINEL P150 HFB is a high-performance, fleece-backed, thermoplastic polyvinyl chloride (PVC) membrane designed for both steep and low slope applications….
View ProductSOPRAFIX® 2.4″ Membrane Stress Plates
SOPRAFIX® 2.4″ Stress Plates are specifically manufactured for use in SOPRAFIX® Systems. The unique design, including barbs and ribs, provides…
View ProductALSAN® RS QUARTZ AGGREGATE
ALSAN RS QUARTZ AGGREGATE are colored aggregates used to achieve an aesthetic finish, bond/wearing layer or non-skid wearing surface for…
View ProductRelated Projects
San Francisco Airport – San Francisco, California
San Francisco International Airport is the 13th largest airport in the United States featuring four modern runways. The new International Terminal opened in 2000 and had the distinction of being the largest terminal building ever built in North America. SOPREMA was able to provided a cost-competitive, UL Class A system with a 20-year labor and material warranty.
Beijing Zoo Road Bridge – Beijing, China
The Zoo Road viaduct bridge crosses Beijing Zoo, as a part of the infrastructure for Beijing 2008 Olympic Games. The waterproofing area is about 27,000 ft2, and completed October 2007. The waterproofing layer was installed by SOPREMA Macaden Automatic Installation System with 200 meter long SBS modified bitumen membrane—ANTIROCK.