COLPHENE® FLAM 250 FR GR SKU: 01223
COLPHENE® FLAM 250 FR GR SKU: 01223
COLPHENE® Flam 250 FR GR (fire retardant, granulated) is an SBS-modified bitumen cap ply for use in approved multi-ply membrane waterproofing assemblies. COLPHENE Flam 250 FR GR is composed of a proprietary formulation of elastomeric styrene-butadiene-styrene (SBS) polymer modified bitumen and is reinforced with a tough, dimensionally stable non-woven polyester mat. The topside is surfaced with ceramic coated granules and underside is surfaced with polyolefin burn-off film to optimize heat welding.
Product Properties
- ASTM ASTM D6164
- Installation Method Heat Welded
- Thickness 157 mils (4.0 mm)
- Topside Granules
- Underside Burn Off Film
Installation
Prior to installation, unroll COLPHENE Flam 250 FR GR onto the surface and allow to relax. Position COLPHENE Flam 250 FR GR in desired position and back roll the product. COLPHENE Flam 250 FR GR is then heat welded to approved substrates. Refer to SOPREMA® specifications and installation instructions for additional application guidelines.
Testing & Approvals
Related Products
SOPRALENE® 180 PS 2.2
SOPRALENE 180 PS 2.2 is an SBS-modified bitumen base ply for use in approved multi-ply membrane and flashing assemblies. SOPRALENE…
View ProductSOPRALENE® 250 SP 4.0
SOPRALENE 250 SP 4.0 is an SBS-modified bitumen base ply for use in approved multi-ply membrane and flashing assemblies. SOPRALENE…
View ProductALSAN Trafik PU 215
ALSAN TRAFIK PU 215 is a multi-component, toluene diisocyanate (TDI) free, water-catalyzed, polyurethane elastomeric waterproofing base membrane. ALSAN TRAFIK PU…
View ProductRelated Projects
Pearl Block 136 – Portland, Oregon
For this project, SOPREMA’s SOPRASEAL® product line was selected to provide an airtight barrier. The project was originally specified with another membrane, but due to poor adhesion, our SOPRASEAL Stick VP and SOPRASOLIN® HD products were substituted in.
San Francisco Airport – San Francisco, California
San Francisco International Airport is the 13th largest airport in the United States featuring four modern runways. The new International Terminal opened in 2000 and had the distinction of being the largest terminal building ever built in North America. SOPREMA was able to provided a cost-competitive, UL Class A system with a 20-year labor and material warranty.