SOPREMA

Search

ALSAN TRAFIK PU 410 SKU: 00513098

ALSAN TRAFIK PU 410 SKU: 00513098

ALSAN TRAFIK PU 410 is a single-component, aromatic urethane elastomeric topcoat. This topcoat provides excellent adhesion to SOPREMA polyurethane system base coats for application of SOPREMA polyurethane coating systems. ALSAN TRAFIK PU 410 is recommended for light and heavy-duty pedestrian and vehicular applications that are not directly exposed to sunlight.

Product Properties

  • Material Polyurethane
  • Technology Polyurethane

Installation

ALSAN TRAFIK PU 410 should be thoroughly mixed prior to application to ensure a consistent homogeneous material from top to bottom. ALSAN TRAFIK PU 410 should be mixed using a jiffy blade mixer at slow speed for at least 2 – 3 minutes. ALSAN TRAFIK PU 410 is applied to the approved area via roller, trowel or notched squeegee. The resin should be applied evenly onto the surface at a wet film thickness of 15 -20 mils (0.4 – 0.5 mm).

 

Related Products

SENTINEL® P200

SENTINEL P200 is a high-performance, bare-backed, thermoplastic polyvinyl chloride (PVC) membrane designed for both steep and low slope applications. SENTINEL…

View Product

ACOUSTIDRAIN

ACOUSTIDRAIN is a revolutionary acoustic product that eliminates the noise caused by water flowing in indoor sanitary drainage or fall…

View Product

INSONO AF3-90

INSONO AF3-90 is composed of self-adhesive elastomeric bitumen with an exposed non-woven polyester reinforcement. The underside is surfaced with a…

View Product

Related Projects

Flatiron Building – New York, New York

The Flatiron Building is a triangular 22-story, steel-framed building located at 175 Fifth Avenue in the borough of Manhattan, and is considered to be a ground-breaking skyscraper.

Northeast Louisiana State Office Building – Monroe, Louisiana

As an approved manufacturer for the State of Louisiana, the decision makers at the Facility Planning and Control Department were assured that the products installed offered unsurpassed quality. The final assembly was designed to meet FM Approvals 1-90 wind uplift test and proves to protect the building for many years to come.