SOPREMA

Search

COLPHENE® 180 SP SKU: 01219

COLPHENE® 180 SP SKU: 01219

COLPHENE 180 SP (sanded, polyolefin) is a SBS-modified bitumen membrane approved for use in waterproofing assemblies. COLPHENE 180 SP is reinforced with tough, dimensionally stable non-woven polyester mat that is saturated and coated on both sides with a proprietary formulation of elastomeric styrene-butadiene-styrene (SBS) polymer modified bitumen.

Product Properties

  • Installation Method Cold Adhered
  • Installation Method Heat Welded
  • Reinforcement Non-Woven Polyester
  • Thickness 87 mils (2.2 mm)
  • Topside Sanded
  • Underside Polyolefin Burn-Off Film

Installation

Prior to installation, unroll COLPHENE 180 SP onto the deck and allow to relax. Position COLPHENE 180 SP in desired position and back roll the product. COLPHENE 180 SP is then heat welded to approved substrates.

 

Testing & Approvals

Related Products

SOPRALENE® 250 SANDED

SOPRALENE 250 Sanded is an SBS-modified bitumen base ply for use in approved multi-ply membrane and flashing assemblies. SOPRALENE 250…

View Product

ELASTOPHENE® FLAM HS FR GR

ELASTOPHENE® Flam HS FR GR (high strength, fire retardant, granules) is an SBS modified bitumen cap ply for use in…

View Product

COLPHENE® FLAM 180

COLPHENE® Flam 180 is an SBS-modified bitumen cap ply is reinforced with a tough, dimensionally stable nonwoven polyester mat. The topside and underside are surfaced with polyolefin burn-off film to optimize heat welding.

View Product

Related Projects

Michigan State University – East Lansing, Michigan

The facilities management staff at Michigan State University is responsible for over 17,000,000 sq.ft. of roofs. When the staff determines that a re-roof of one of the 580 buildings on campus is necessary, options are limited to known and trusted manufacturers that offer systems with superior in-field performance, such as SOPREMA.

San Francisco War Memorial – San Francisco, California

SOPREMA’s advanced PMMA membrane system, ALSAN® RS 230 was chosen for waterproofing this international landmark because of the ease of installation in tight areas and short time schedule.