SOPREMA

Search

ALSAN TRAFIK PU 211 SKU: 00513097

ALSAN TRAFIK PU 211 SKU: 00513097

ALSAN Trafik PU 211 is a single-component, polyurethane elastomeric basecoat. This basecoat provides excellent adhesion to SOPREMA polyurethane system topcoats for application of SOPREMA polyurethane coating system. ALSAN Trafik PU 211 is recommended for light-duty pedestrian and vehicular applications.

Product Properties

  • Material Polyurethane
  • Technology Polyurethane

Installation

ALSAN Trafik PU 211 is applied via notched squeegee, roller or notched trowel. Prior to application, refer to published specifications and approved details for complete application instructions. ALSAN Trafik PU 211 should be thoroughly mixed prior to application to ensure a consistent homogeneous material from top to bottom. ALSAN Trafik PU 211 should be mixed using a jiffy blade mixer at slow speed for 2-3 minutes.

 

Our Other Brands

Related Products

SENTINEL® P150

SENTINEL® P150 is a high performance, polyester reinforced, thermoplastic polyvinyl chloride (PVC) roof membrane, specially designed to provide unmatched flexibility…

View Product

SOPRANATURE® GEONET

SOPRANATURE Geonet is composed of a high-density polyethylene geonet drainage layer fused to a non-woven filter fabric. SOPRANATURE Geonet is…

View Product

SOPRA™ 4897

SOPRA 4897 is an SBS-modified bitumen venting base sheet for use in approved multi-ply membrane and flashing assemblies. SOPRA 4897…

View Product

Related Projects

MODE Apartments – Chicago, Illinois

The MODE Apartments located in Logan Square, just northwest of downtown Chicago, offers residents luxurious living both inside and out. SOPREMA’s SOPRANATURE® product line was used to develop the private patios and common areas that are available to residents.

Northeast Louisiana State Office Building – Monroe, Louisiana

As an approved manufacturer for the State of Louisiana, the decision makers at the Facility Planning and Control Department were assured that the products installed offered unsurpassed quality. The final assembly was designed to meet FM Approvals 1-90 wind uplift test and proves to protect the building for many years to come.