Search

SOPRANATURE® DRAIN BOX SKU: W856

SOPRANATURE® DRAIN BOX SKU: W856

Manufactured from recycled acrylonitrile-butadiene-styrene (ABS) with narrow slots on the sidewalls and small holes on the top cover, SOPRANATURE DRAIN BOX blocks debris while allowing continuous water flow to roof drains. A 12-inch opening provides unobstructed drain access, and wide bottom extensions ensure the drain box will not float during times of high water intake. SOPRANATURE DRAIN BOX comes in a standard 4 in height that can extend up to 32 in with extension kits.

Installation

Interlock sidewall panels at each corner and stagger horizontal joints. Connect sidewalls to the bottom plate and top cover. Assemblies measuring over 16 in high must be screwed together. Refer to the diagram shown on the right.

 

Related Products

SOPRALENE® FLAM 250

SOPRALENE® Flam 250 is an SBS-modified bitumen base ply for use in approved multi-ply membrane and flashing assemblies. SOPRALENE Flam…

View Product

SOPRABASE™ TG

SOPRABASE TG is an SBS modified bitumen, polyester-reinforced base sheet for use in multi-ply membrane assemblies. The underside has a…

View Product

COLPHENE® BSW H

COLPHENE BSW H is an SBS-modified bitumen waterproofing membrane for use in approved blind side/under slab waterproofing assemblies. COLPHENE BSW…

View Product

Related Projects

Hard Rock Casino – Atlantic City, New Jersey

The Hard Rock® Casino, a new addition to the Atlantic City Boardwalk, spans over 17 acres and awes guests upon arrival with a giant guitar. To hold up the Hard Rock reputation, the property boasts a variety of musical artifacts and memorabilia for guests to peruse. With over 20 nightlife and dining options onsite, the hotel offers entertainment 365 days a year.

Northeast Louisiana State Office Building – Monroe, Louisiana

As an approved manufacturer for the State of Louisiana, the decision makers at the Facility Planning and Control Department were assured that the products installed offered unsurpassed quality. The final assembly was designed to meet FM Approvals 1-90 wind uplift test and proves to protect the building for many years to come.