ALSAN TRAFIK PU 411 SKU: 00513099
ALSAN TRAFIK PU 411 SKU: 00513099
ALSAN Trafik PU 411 is a single-component, aliphatic urethane elastomeric topcoat. This topcoat provides excellent adhesion to SOPREMA polyurethane system base coats for application of SOPREMA urethane coating system. ALSAN Trafik PU 411 is recommended for light-duty pedestrian and vehicular applications that are directly exposed to sunlight.
Product Properties
- Material Polyurethane
- Technology Polyurethane
Installation
ALSAN Trafik PU 411 is applied via notched squeegee, roller or notched trowel. Prior to application, refer to published specifications and approved details for complete application instructions. ALSAN Trafik PU 411 should be thoroughly mixed prior to application to ensure a consistent homogenous material from top to bottom. ALSAN Trafik PU 411 should be mixed using a jiffy blade mixer at slow speed for 2-3 minutes.
Related Products
ALSAN® RS 230 FIELD
ALSAN RS 230 FIELD is a high-performance, rapid-setting, polymethyl methacrylate (PMMA) liquid resin. ALSAN RS 230 FIELD resin is combined…
View ProductELASTOPHENE® LS FR GR
ELASTOPHENE LS FR GR (low slope, fire retardant, granulated) is an SBS-modified bitumen cap ply for use in approved multi-ply…
View ProductDUOTACK® SPF ADHESIVE
DUOTACK SPF ADHESIVE is a low-pressure, two-component spray polyurethane foam adhesive formulated for adhering SENTINEL HFB (Heavy Fleece-Backed) PVC membranes,…
View ProductRelated Projects
The Westin Savannah Harbor – Savannah, Georgia
The Westin was due for a roof replacement on 17,828 square feet of its property. To complete the project, SOPREMA’s SOPRAISO ™, DUOTACK®, SENTINEL® P-150, and ALSAN® RS 230 Flash were selected. These products allowed for the design to meet FM 1-120 codes and the use of ALSAN RS 230 Flash solved any difficult flashing details which was only one of many reasons
SOPREMA products were selected.
Walter Reed Community Center – Arlington, Virginia
From the beginning, the architect designing the Walter Reed Community Center was asked to include a vegetative roof within the blueprints. The goal was a LEED certified Silver level building.