SOPREMA

Search

2-1 SOPRASMART BOARD SKU: 09971, 09972, 09977, 09979

2-1 SOPRASMART BOARD SKU: 09971, 09972, 09977, 09979

2-1 SOPRASMART BOARD is a high-performance factory laminated panel combining an SBS-modified bitumen base membrane and SOPRABOARD an asphaltic roof cover board. The 2-1 SOPRASMART BOARD is designed for use in approved multi-ply roof membrane assemblies.

Installation

Prior to installation, unfold 2-1 SOPRASMART BOARD onto the roof surface and allow to relax. 2-1 SOPRASMART BOARD is installed via mechanical fastening, approved adhesive or hot asphalt following manufacturer specifications. When installing via mechanical fastening, 2-1 SOPRASMART BOARD is fastened through the patented DUO SELVEDGE lap following the details for the uplift pressure required.

Refer to the SOPREMA Low-Slope Roofing Insulation Technical Manual for complete application guidelines.

 

Related Products

3-1 SOPRASMART ROCK

3-1 SOPRASMART ROCK is a high performance panel of an SBS-modified bitumen base membrane, SOPRAROCK mineral wool board, and polyisocyanurate…

View Product

SOPRALAP FLAM

SOPRALAP Flam is an SBS-modified bitumen cover strip for use with SOPRASMART Laminated Board products. SOPRALAP Flam is reinforced with…

View Product

SOPRALAP SP

SOPRALAP SP (sanded, polyolefin) is an SBS-modified bitumen cover strip for use with SOPRASMART Laminated Board products. SOPRALAP SP is…

View Product

Related Projects

World Vision – Federal Way, Washington

When looking for a quality roof system that would have minimal impact on everyday operations and overall budget, Wayne’s Roofing, Inc. selected SOPREMA’s SOPRASMART® product line. Not only was SOPRASMART® an affordable product, it also offered time and labor savings.

American Airlines Center – Dallas, Texas

On March 21, 2022, a leaky roof on Dallas' American Airlines Center delayed the start of an NBA game between the hometown Mavericks and the Minnesota Timberwolves, and after the issue surfaced again a couple months later to interfere with a Mavs playoff game, quick action was needed to replace the building's 20-year-old roof.