SOPREMA

Search

SOPRA-TITE Modified 300 Fascia SKU: M1007

SOPRA-TITE Modified 300 Fascia SKU: M1007

SOPRA-TITE Modified 300 Fascia is manufactured in 12 foot lengths with pre-punched fastening holes in the galvanized water dam to ensure correct fastener placement and spacing. It has prefabricated miters and accessories to ensure a proper fit and prevent the need for any field fabrication. SOPRA-TITE Modified 300 Fascia features dual attachment points on both the face and roof deck for added flexibility when accommodating roof irregularities. It is available as an easy snap-on version or a crimp-on version. The SOPRA-TITE Modified 300 Fascia offers a finish with no exposed fasteners, ideal for a project focused on aesthetics.

Metal Era Product PageRequest a Quote

Product Properties

  • Type Fascia

Installation

Apply via mechanically fastening.

 

Testing & Approvals

Related Products

ELASTOPHENE® HR SANDED 3.0

ELASTOPHENE HR Sanded 3.0 (high resistance) is an SBS-modified bitumen base ply for use in approved multi-ply membrane and flashing…

View Product

MODIFIED SOPRA G

MODIFIED SOPRA G is an SBS-modified bitumen-coated base sheet for use as an anchor sheet for cold adhesive or heat…

View Product

ELASTOPHENE® FLAM FR+ GR

ELASTOPHENE® Flam FR+ GR (fire retardant, granules) is an SBS-modified bitumen cap ply for use in approved multi-ply membrane and…

View Product

Related Projects

Carrick High School – Pittsburgh, Pennsylvania

In 2017, Carrick High School’s roof was ready to be replaced. It was decided the best option was to tear off the previous roof and start fresh. Due to the relationship the architect, HHSDR Architects / Engineers, has with SOPREMA, the system that was selected to replace the previous roof included: SOPRA-ISO®, SOPRABOARD®,  SOPRALENE® Flam Stick and SOPRALENE FLAM 180 FR GR.

U.S. Treasury Building – Washington DC

The Treasury Building is the oldest departmental building in Washington and has had a great impact on the design of other governmental buildings. At the time of its completion, it was one of the largest office buildings in the world.