Search

SOPRALENE® 180 FR+ GR SKU: 01312

SOPRALENE® 180 FR+ GR SKU: 01312

SOPRALENE 180 FR+ GR (fire retardant, granulated) is an SBS-modified bitumen cap ply for use in approved multi-ply membrane and flashing assemblies. SOPRALENE 180 FR+ GR is composed of a proprietary formulation of elastomeric styrene-butadiene-styrene (SBS) polymer modified bitumen and is reinforced with a tough, dimensionally stable non-woven polyester mat. The topside is surfaced with ceramic coated granules and the underside is surfaced with fine mineral aggregate to facilitate cold adhesive application.

Product Properties

  • ASTM ASTM D6164
  • Component Cap
  • Installation Method Cold Adhered, Asphalt Adhered
  • Reinforcement Polyester
  • Thickness (minimum) 150 mils (3.8 mm)
  • Thickness (nominal) 157 mils (4.0 mm)
  • Topside Granules
  • Underside Sanded

Installation

Prior to installation, unroll SOPRALENE 180 FR+ GR onto the roof surface and allow to relax. Place SOPRALENE 180 FR+ GR in desired position and back roll the product. Apply approved cold adhesive following manufacturer specifications. SOPRALENE 180 FR+ GR is then rolled into the cold adhesive and subsequently rolled with a weighted roll if utilizing cold adhesives. Refer to the SOPREMA SBS Roofing Guide for additional application guidelines.

 

Testing & Approvals

Related Products

2-1 SOPRASMART ROCK

2-1 SOPRASMART ROCK is a high performance panel composed of an SBS-modified bitumen base membrane and SOPRAROCK high density mineral…

View Product

ALSAN Trafik PU 215

ALSAN TRAFIK PU 215 is a multi-component, toluene diisocyanate (TDI) free, water-catalyzed, polyurethane elastomeric waterproofing base membrane. ALSAN TRAFIK PU…

View Product

SOPRALAST® 50 TV ALU SANDED

SOPRALAST 50 TV ALU SANDED is a SBS-modified bitumen membrane used in roofing assemblies. SOPRALAST 50 TV ALU SANDED is…

View Product

Related Projects

American Airlines Trinity Campus – Fort Worth, Texas

When American Airlines, the world’s largest airline by fleet size, wanted to bring 12,000 employees together at a centralized location, it was a big job, to say the least.

Perry Monument – Put-in-Bay, Ohio

At 352-feet, it is among the tallest monuments. The world’s most massive Doric column was constructed by a multi-state commission from 1912 to 1915 “to inculcate the lessons of international peace by arbitration and disarmament”.