SOPREMA

Search

SOPRAMASTIC™ SBS ELASTIC CEMENT SKU: 35635

SOPRAMASTIC™ SBS ELASTIC CEMENT SKU: 35635

SOPRAMASTIC™ SBS Elastic Cement is a modified bitumen mastic for use in approved multi-ply membrane and flashing assemblies. SOPRAMASTIC SBS Elastic Cement is composed of a proprietary formulation of elastomeric modified bitumen and solvents. SOPRAMASTIC SBS Elastic Cement may be used as an adhesive for drain leads, pipe flanges, metal gravel stops, and more.

Product Properties

  • Overlying Material SBS Membrane
  • Type Membrane Accessories

Installation

SOPRAMASTIC SBS Elastic Cement is applied to the approved area via caulking gun or trowel. Refer to the SOPREMA® SBS Roofing Manual for additional application guidelines.

 

Testing & Approvals

Related Products

COLPHENE® LM BARR Spray

COLPHENE LM BARR Spray is a single component, 95% solids content, liquid applied, moisture curing elastomeric waterproofing membrane. COLPHENE LM…

View Product

SOPRABARRIER 20/30 PE

SOPRABARRIER is designed to protect underlying roofing and waterproofing assemblies from root penetration. SOPRABARRIER is composed of a virgin blended…

View Product

ALSAN TRAFIK PU 211

ALSAN Trafik PU 211 is a single-component, polyurethane elastomeric basecoat. This basecoat provides excellent adhesion to SOPREMA polyurethane system topcoats…

View Product

Related Projects

University of Oregon Residence Hall – Eugene, Oregon

With a student population of over 24,000, the University of Oregon was in need of a new residence hall. When selecting an air barrier for the project, it was decided that SOPRASEAL® Stick VP and SOPRASOLIN® HD would be applied.

Parkland Hospital – Dallas, Texas

The new hospital featured flat rooftops at multiple levels that all needed to be made watertight for decades to come. The roofing system needed to be designed in a way that accounted for a helipad, consistent rooftop traffic, extensive rooftop equipment, lightwells and various utility platforms. A lot stood in the way of Anchor Roofing, the installer, but the meticulous planning for the project meant that all contingencies had been considered by the time application of the waterproofing system began.