Project Profiles

Airport High School – West Columbia, South Carolina

Because of the uneven surface of the remaining embedded aggregate, SOPRAROCK® was chosen knowing that this board would conform to the uneven surface much better than a rigid coverboard could. This idea spawned another....”why not use SOPRASMART® XP”; and allow one application step instead of two. The project was capped off with SOPRALENE® 180 FR GR, in COLPLY® Adhesive.

Assurant Building – Miami, Florida

In 2015, Assurant, a risk management solutions company, was in need of a full re-roof on their 92,180 square foot building. When searching for a roofing solution that met all codes and requirements, it was decided that a modified bitumen three ply roof system with a SOPRASTAR® cap ply would replace the existing roof. The SOPRASTAR® cap ply membrane easily met both the Miami- Dade code and Factory Mutual (FM) guidelines, making it one less concern.

John R. Oishei Children’s Hospital – Buffalo, New York

SOPREMA’s SOPRASEAL® Xpress G air and vapor barrier was ideal for this project. The exterior grade, inorganic faced gypsum board with an air and vapor barrier factory applied to the exterior surface, is the first and only ABAA evaluated assembly. SOPRASEAL® Xpress G boards are mechanically fastened to the structure using corrosion resistant SOPRASEAL® Xpress G Screws. A 6 inch self-adhered strip of SOPRASEAL® Stick 1100T is then installed over all board joints.

World Vision – Federal Way, Washington

When looking for a quality roof system that would have minimal impact on everyday operations and overall budget, Wayne’s Roofing, Inc. selected SOPREMA’s SOPRASMART® product line. Not only was SOPRASMART® an affordable product, it also offered time and labor savings.

Placer County Water Agency – Auburn, California

In 2015, the Placer County Water Agency took on a tear-off roofing project, in which SOPREMA products were used. SOPREMA was the right choice for this project because the breadth of products met the designer’s needs, including meeting California Title 24 energy efficiency standards with the use of ENERGY STAR® rated SOPRASTAR® Flam. Another appealing aspect was the versatility of SENTINEL® P150, which allowed coverage for the vertical walls throughout the roofing system.

Kaiser Permanente WLAMC – Los Angeles, California

SOPREMA was selected for this project because of the relationships built with the architect, consultant, and contractor. They chose to use DUOTACK® to adhere the insulation and SOPRABOARD® to the upper deck. SOPRALENE® Flam 180 was the selected base ply and was covered with a SOPRALENE® Flam 250 FR GR SG cap sheet. To further seal the roof, all penetrations were waterproofed with ALSAN® RS.

Fayetteville Area System of Transit Multimodal Project – Fayetteville, North Carolina

The original design selected for the center left the project over budget, so the contractor and architect had to go back to the drawing board. After researching additional options, both Baker Roofing and Gantt Huberman Architects felt very comfortable with SOPREMA’s proven history and the ability to meet the Buy American requirement, so they selected the SENTINEL® line for the project.

Chinese Hospital Outpatient Center – San Francisco, California

SOPREMA’s SENTINEL line was the product of choice for this project because of its proven quality, competitive pricing and superior technical support. Platinum Roofing, the contractor for the project, utilized SENTINEL G150, SENTINEL H2O Bonding Adhesive, SENTINEL VCM, and SENTINEL Prefabricated Corners and Pipe Flashings to complete the roof.

Deer Meadow Primary School – Greencastle, Indiana

Deer Meadow Primary School is a public elementary school located in Greencastle, IN. Designed with highly visible roofing architectural appearance on all sides of the building, a roofing membrane with color matching aesthetics and long-term performance was needed. SOPREMA®’s SENTINEL® Copper Art P150 HFB PVC was a perfect fit.

U.S. Air Force Academy Civil Engineering Storage – Colorado Springs, Colorado

SOPREMA®’s Liquid Membrane System ALSAN® RS 230 was installed at the storage facility where the students build sprinkler systems, wood sheds, waste water systems, test materials and participate in team-building and problem-solving activities